The first crew works at a rate of 1/18 of a complete job per
hour. The second crew works at a rate of 1/12 of a complete
job per hour. If "x" is the time required by the two crews together,
then the first will do 1/18 of "x" and the second can do 1/12 of "x".
Therefore, the equation needed to solve this problem is :
x/18 + x/12 = 1 (completed job)
x = 7.2 hours